China Aluminum LED Traffic Light

Home Forums The FFSL Forum China Aluminum LED Traffic Light

This topic contains 0 replies, has 1 voice, and was last updated by  Anonymous 9 months, 3 weeks ago.

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #219

    Anonymous

    Technical Index
    Lamp Diameterφ200mm φ300mm φ400mm
    Working Power Supply170V ~ 260V 50Hz
    Rated Powerφ300mm<10w φ400mm<20w
    Light Source Life≥50000 hours
    Environment Temperature-40°C~ +70°C
    Relative Humidity≤95%
    ReliabilityMTBF≥10000 hours
    MaintainabilityMTTR≤0.5 hours
    Protection LevelIP55
    Product Feature
    1. The light source is made of imported ultra-high brightness LED. The Light housing is made of throwaway aluminum die-casting or engineering plastic injection molding. The diameter of light plate light-emitting surface is 200mm 300mm, 400mm.
    2. The Light pole is made of high-quality steel plate, treated by hot-dip galvanization and surface spray. The technical parameters are in line with road traffic lights GB14887-2011 standard of the People’s Republic of China.
    Packing Information
    LengthWidth Height
    401595826
    4021055826
    4031525826
    4041995826
    4052465826
    4062935826
    301504924
    302864924
    3031224924
    3041584924
    3051944924
    3062304924

    Xintong is the First company in Eastern China focused on traffic equipment, having 20 years’ experience, covering 1/5 Chinese domestic market.
    Products successfully applied in over 136 Countries.
    Hardware ProblemSoftware ProblemUrgent Problem
    Within WarrantyIf the problem can’t be solved in 48 hours, Xintong will send a brand new one for free, or return the product cost to the customer.If the problem can’t be solved in 48 hours remotely, Xintong engineer will arrive at the scene in 48 hours. Xintong is responsible for all expenses.If the problem can’t be solved in 24 hours remotely, Xintong engineer will arrive at the scene in 24 hours. Xintong is responsible for all expenses.
    Beyond WarrantyIf the problem can’t be solved in 48 hours, Xintong will send a brand new one, only charging the cost.If the problem can’t be solved in 48 hours remotely, Xintong engineer will arrive at the scene in 48 hours. The customer is responsible for all expenses.If the problem can’t be solved in 24 hours remotely, Xintong engineer will arrive at the scene in 24 hours. The customer is responsible for all expenses.
    China Aluminum LED Traffic Light
    website:http://www.xtonsolar.com/led-traffic-light/aluminum-led-traffic-light/

Viewing 1 post (of 1 total)

You must be logged in to reply to this topic.